Eco Village Cloughjordan

Our first project in the Eco Village on site no. 91 commenced August 2009. It consisted a two story gabled house with lower level out-shot.

The construction consisted of our prefabricated timber frame encased with 300mm of HemeCrete.

Our engineered timber frame stud-work was sheeted internally with 9mm RESISTANT Multi-Pro, which also served as the finished internal lining board to which a skim coat will be applied. In two days our experienced team of fitters had erected all ground floor walls, intermediate floor ( prefabricated floor panels) and upper walls, at this stage the house was ready for first fix electrical and plumbing which was completed before pouring of HemeCrete. Our fitters then returned and completed erection of roof structure which consisted of trusses , HUNTON BITROC roof sarking, batten and counter batten.

 

Foundations being prepared before                                Panels being off loaded on site  Day 1

arrival of our prefabricated timber frame

 

Ground floor walls completed  Day 1                               Intermediate floor panels in situ  Day 2

 

Upper walls completed Day 2                                         Structure ready for first fix electrical

and plumbing

 

Shuttering in place on third day's pouring                       HemeCrete complete

of HemeCrete

 

HUNTON BITROC roof sarking, batten and

counter batten completed.

 

Slate manufactured from recycled materials

Surpasses Passive House requirment of .6 ACH/hr Read more »
Galway Racecourse, Ballybrit  7-8 May 2011 Read more »
Our Erectors achieve Skillnet accreditation     Read more »
In a year of few highlights for the Irish construction industry,... Read more »
Buildings account for some 40 % of European energy consumption and... Read more »
Our first project in the Eco Village on site no. 91 commenced... Read more »